Framing Progress on Lot 85 + Design Window Still Open for Lot 84
As we hit mid-spring, construction at Shevlin West is moving quickly — and the energy around our current builds is real.
Lot 85: Framed and Looking Fantastic Lot 85 is now fully framed and starting to take shape. From the elevated views to the open interior layout and generous garage space (yes, it has a Sprinter bay!), this home is on track for a summer move-in. Windows and roofing are up next, and we’ll be sharing more photos soon as finishes start to roll in.
Lot 84: Final Week for Design Input Lot 84 has officially broken ground, and excavation and footings are underway. If you or your clients are looking to make key decisions on finishes, layout adjustments, or exterior selections — now’s the time. We’re about to pour slab and frame within the next two weeks, which will lock in most customization opportunities.
Why Now Is the Sweet Spot These side-by-side homes offer incredible potential — vaulted ceilings, premium kitchen packages, and the indoor/outdoor flow that makes Shevlin West so special.
With spring in full swing and demand picking up, we encourage early interest in the remaining design/build lots: Lots 8, 9, 10, 95, and 96.
Want to Learn More? Serious inquiries can reach out to Tom directly at malacehomes.com/contact or by phone at 541-408-2178. We’re happy to walk you through the build process and available upgrades.
Let’s build something exceptional, together.
Tom Malace, Founder