30%: Plumbing, Electrical and HVAC

Once the shell is finished, siding and roofing can be installed. At the same time, the electrical and plumbing contractors start running pipes and wires through the interior walls, ceilings and floors. Sewer lines and vents, as well as water supply lines for each fixture, are installed. Bathtubs and one-piece shower/tub units are put in place at this point because…
30%: Plumbing, Electrical and…

20%: Rough Framing

The floor systems, walls and roof systems are completed (usaully known as the shell or skeleton of the house). Plywood or oriented strand board (OSB) sheathing is applied to the exterior walls and roof, and windows and exterior doors are installed. The sheathing is then covered with a protective barrier known as a house wrap; it prevents liquid water from…
20%: Rough Framing

10%: Prepare Site and Pour Foundation

Using a backhoe and a bulldozer, the crew clears the site of rocks, debris and trees for the house and, if applicable, the septic system. The crew levels the site, puts up wooden forms to serve as a template for the foundation, and digs the holes and trenches. Footings (structures where the house interfaces with the earth that supports it)…
10%: Prepare Site and…

05%: Plans and Permitting

​​A building permit is required for all new homes and when existing homes are remodeled or additions are made. The permit is issued when structures are designed in accordance with the building codes and all other applicable codes and ordinances, to ensure the safety of the structure.
05%: Plans and Permitting