Construction Stages
Sold
Sold
35%: Rough mechanical started
35%: Rough mechanical started
100%: Move-in Ready listed with Russell
This home is now ready for Move-in and listed Russell Ali at (541) 728-4006.
100%: Move-in Ready listed…
100%: Move-in Ready
This home is now ready for Move-in and listed with Cascade Sothebys International Realty at (541) 580-0817.
100%: Move-in Ready
90%: Glass, Shower Doors Installation and Flooring Finishes
Mirrors, shower doors and carpeting are installed, and final cleanup takes place. At this stage, we are 2-3 weeks away from listing this home with our realtor partners.
90%: Glass, Shower Doors…
80%: Trim and Fixture Installation
Light fixtures, outlets and switches are installed and the electrical panel is completed. HVAC equipment is installed and registers are completed. Sinks, toilets and faucets are put into place. At this stage, we are 3-4 weeks away from listing this home with our realtor partners.
80%: Trim and Fixture…
70%: Flooring and Countertops Installation
At this stage, we install hard-surface flooring and countertops. Ceramic tile, vinyl and wood flooring are installed as well as countertops.
70%: Flooring and Countertops…
60%: Interior Doors, Baseboards, Sills and Paint
Finish interior trim; install exterior driveways and walkways: Interior doors, baseboards, door casings, window sills, moldings, stair balusters and other decorative trim are installed, along with cabinets, vanities and fireplace mantels and surrounds. Walls get a finish coat of paint and are wallpapered where applicable.
60%: Interior Doors, Baseboards,…
50%: Drywall, Interior Textures, Primer
Complete drywall and interior textures. The primer coat of paint is also applied after taping is complete.
50%: Drywall, Interior Textures,…
40%: Insulation Installation
Malace homes are insulated in all exterior walls, as well as the attic and any floors that are located above unfinished basements or crawl spaces.